We have a commitment and more importantly action from our property owner on fixing the roof. His stated plan is to try for a green roof, but we’ll see what happens with the contractors bid from yesterday.
This has allowed us to move forward with buildout at a higher confidence level than in prior weeks.
- This week the wiring in the metalshop was completed
- The circuit breaker was tested accidentally but successfully
- Sourced: metal storage cabinet
- Sourced: two desks
- Sourced: a metal base and top for a really beefy yet portable main work table
- Sourced: a fridge (yes!)
- Sourced: a metal grinder and wire wheel buffer are spinning
- Sourced: a Porter Cable cutoff saw
- Sourced: a good selection of stock mild steel to assist in the buildout with tables, etc.
Phew. Lots of stuff going on. Next up:
- Build the metalshop worktable.
- Acquire plasma cutter.
- Slice up the old metal table that came with the space to make two smaller tables.
- Focus on painting the clean room.
Looking to source the following:
- Plastic curtain room divider.
- Sizable window A/C unit.
- Paint gun (Aaron I’ll ping you).
- Help with painting. Most everything is primed just need final coats.
Getting closer! And the place no longer looks like the set for Saw II.