We have a commitment and more importantly action from our property owner on fixing the roof. His stated plan is to try for a green roof, but we’ll see what happens with the contractors bid from yesterday.

This has allowed us to move forward with buildout at a higher confidence level than in prior weeks.

  1. This week the wiring in the metalshop was completed
  2. The circuit breaker was tested accidentally but successfully
  3. Sourced: metal storage cabinet
  4. Sourced: two desks
  5. Sourced: a metal base and top for a really beefy yet portable main work table
  6. Sourced: a fridge (yes!)
  7. Sourced: a metal grinder and wire wheel buffer are spinning
  8. Sourced: a Porter Cable cutoff saw
  9. Sourced: a good selection of stock mild steel to assist in the buildout with tables, etc.

Phew. Lots of stuff going on. Next up:

  1. Build the metalshop worktable.
  2. Acquire plasma cutter.
  3. Slice up the old metal table that came with the space to make two smaller tables.
  4. Focus on painting the clean room.

Looking to source the following:

  1. Plastic curtain room divider.
  2. Sizable window A/C unit.
  3. Paint gun (Aaron I’ll ping you).
  4. Help with painting. Most everything is primed just need final coats.

Getting closer! And the place no longer looks like the set for Saw II.