{"id":41,"date":"2012-04-13T14:56:33","date_gmt":"2012-04-13T14:56:33","guid":{"rendered":"http:\/\/www.chattlab.org\/blog\/2012\/04\/build-progress-continues\/"},"modified":"2012-06-04T15:18:06","modified_gmt":"2012-06-04T15:18:06","slug":"build-progress-continues","status":"publish","type":"post","link":"https:\/\/blog.chattlab.org\/blog\/build-progress-continues\/","title":{"rendered":"Build Progress Continues"},"content":{"rendered":"<p>We have a\u00a0commitment\u00a0and more importantly <em>action<\/em> from our property owner on fixing the roof. His stated plan is to try for a green roof, but we&#8217;ll see what happens with the contractors bid from yesterday.<\/p>\n<p>This has allowed us to move forward with buildout at a higher confidence level than in prior weeks.<\/p>\n<ol>\n<li>This week the wiring in the metalshop was completed<\/li>\n<li>The circuit breaker was tested accidentally but successfully<\/li>\n<li>Sourced: metal storage cabinet<\/li>\n<li>Sourced: two desks<\/li>\n<li>Sourced: a metal base and top for a really beefy yet portable main work table<\/li>\n<li>Sourced: a fridge (yes!)<\/li>\n<li>Sourced: a metal grinder and wire wheel buffer are spinning<\/li>\n<li>Sourced: a Porter Cable cutoff saw<\/li>\n<li>Sourced: a good selection of stock mild steel to assist in the buildout with tables, etc.<\/li>\n<\/ol>\n<p>Phew. Lots of stuff going on. Next up:<\/p>\n<ol>\n<li>Build the metalshop worktable.<\/li>\n<li>Acquire plasma cutter.<\/li>\n<li>Slice up the old metal table that came with the space to make two smaller tables.<\/li>\n<li>Focus on painting the clean room.<\/li>\n<\/ol>\n<p>Looking to source the following:<\/p>\n<ol>\n<li>Plastic curtain room divider.<\/li>\n<li>Sizable window A\/C unit.<\/li>\n<li>Paint gun (Aaron I&#8217;ll ping you).<\/li>\n<li>Help with painting. Most everything is primed just need final coats.<\/li>\n<\/ol>\n<p>Getting closer! And the place no longer looks like the set for <em>Saw II.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have a\u00a0commitment\u00a0and more importantly action from our property owner on fixing the roof. His stated plan is to try for a green roof, but we&#8217;ll see what happens with the contractors bid from yesterday. This has allowed us to move forward with buildout at a higher confidence level than in prior weeks. This week [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[5],"tags":[],"class_list":["post-41","post","type-post","status-publish","format-standard","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/posts\/41","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/comments?post=41"}],"version-history":[{"count":2,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/posts\/41\/revisions"}],"predecessor-version":[{"id":75,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/posts\/41\/revisions\/75"}],"wp:attachment":[{"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/media?parent=41"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/categories?post=41"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.chattlab.org\/blog\/wp-json\/wp\/v2\/tags?post=41"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}